{"id":7767,"date":"2023-01-23T15:04:52","date_gmt":"2023-01-23T14:04:52","guid":{"rendered":"https:\/\/www.cami.it\/overhaul-of-tandem-pumps-with-parker-electronic-control\/"},"modified":"2026-09-07T09:42:58","modified_gmt":"2026-09-07T07:42:58","slug":"overhaul-of-tandem-pumps-with-parker-electronic-control","status":"publish","type":"post","link":"https:\/\/www.cami.it\/en\/overhaul-of-tandem-pumps-with-parker-electronic-control\/","title":{"rendered":"Parker PV270: Overhaul of an Electronically Controlled Tandem Pump"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The customer asked us to overhaul the tandem applied in their plastic molding department.<br\/>Parker tandem pumps feature an electronic control system that makes them particularly precise and reliable.<\/p>\n\n<p class=\"wp-block-paragraph\"><br\/>After the disassembling and the analyze of the pumps, the department for hydraulic assembly <strong>replaced the gaskets and everything else necessary<\/strong> to make the unit fit for return to production <strong>as quickly as possible.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\"><br\/>The tandem was then fully tested in our test bench with issuance of the <strong>Final Test Certificate.<\/strong><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-table is-style-regular\"><table><thead><tr><th>Description<\/th><th>Model<\/th><th>Displacement <\/th><th>Brand <\/th><\/tr><\/thead><tbody><tr><td>TANDEM PUMPS WITH ELECTRONIC CONTROL<\/td><td> PV270<\/td><td>270 + 270 cc<\/td><td>PARKER<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"600\" data-id=\"7709\" src=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker.jpg\" alt=\"\" class=\"wp-image-7709\" srcset=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker.jpg 1000w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker-300x180.jpg 300w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker-768x461.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"600\" data-id=\"7711\" src=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker2.jpg\" alt=\"\" class=\"wp-image-7711\" srcset=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker2.jpg 1000w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker2-300x180.jpg 300w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker2-768x461.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n<\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"600\" src=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker3.jpg\" alt=\"\" class=\"wp-image-7713\" srcset=\"https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker3.jpg 1000w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker3-300x180.jpg 300w, https:\/\/www.cami.it\/cspa\/wp-content\/uploads\/2023\/01\/tandem-pompe-parker3-768x461.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The customer asked us to overhaul the tandem applied in their plastic molding department.Parker tandem pumps feature an electronic control system that makes them particularly precise and reliable. After the disassembling and the analyze of the pumps, the department for hydraulic assembly replaced the gaskets and everything else necessary to make the unit fit for [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":7710,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-7767","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-history-cami-service"],"_links":{"self":[{"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/posts\/7767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/comments?post=7767"}],"version-history":[{"count":3,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/posts\/7767\/revisions"}],"predecessor-version":[{"id":12140,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/posts\/7767\/revisions\/12140"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/media\/7710"}],"wp:attachment":[{"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/media?parent=7767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/categories?post=7767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cami.it\/en\/wp-json\/wp\/v2\/tags?post=7767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}